Logo
Welcome to Felix Gold
71.9% Sb
Direct shipping material, Bundtzen Vein, meeting MIL-A-22131 before processing
90.8%
Antimony-bearing minerals, with arsenic, lead and copper below detection
250 m+
Main vein zone at surface, open along strike and at depth

Selected high-grade samples, not average grades. No antimony Mineral Resource or Ore Reserve is declared.

Massive stibnite veins

Quartz and coarse stibnite fill at surface, with breccia zones of disseminated stibnite

Grade makes the downstream simple

Most antimony ores need several stages of beneficiation to reach military grade. At Treasure Creek, pilot plant work indicates a simplified route for direct shipping material, with no grinding, flotation or concentrate stage

A historic U.S. supplier

Supplied the United States across three wartime periods. Scrafford, within the project, was Alaska's second-largest antimony mine

Antimony intercepts · S&P Global database

The world's four best antimony intercepts on the S&P database, all Treasure Creek

World top ten

All intercepts reported worldwide, three years

  1. 1Treasure CreekNWTR004 trench · 3m @ 50.26% Sb from 0m151
  2. 2Treasure Creek25TCDC026 · 8.97m @ 12.09% Sb from 16.8m108
  3. 3Treasure Creek23TCRC155 · 15.2m @ 5.5% Sb from 21.3m84
  4. 4Treasure Creek25TCDC004 · 9.8m @ 7.76% Sb from 37.6m76
  5. 5Golden RangeSSRC104 rev · 49m @ 1.31% Sb from 42m64
  6. 6MagwoodMAG010 · 12.1m @ 5.19% Sb from 0m63
  7. 7WabamiskWR25-01 · 19m @ 3.24% Sb from 1m62
  8. 8WabamiskWS25-40 · 51.5m @ 1.1% Sb from 3m57
  9. 9WabamiskA_CS_10.29.24 · 14m @ 3.92% Sb from 0m55
  10. 10HerbertonARRC0001 · 7m @ 7.61% Sb from 38m53
>

Grade thickness, % Sb·m · Treasure Creek in gold · Source: S&P Global Market Intelligence, August 2026. Grade thickness is a comparative measure only. It is not a Mineral Resource and is not an indication of true width. Thickness is as reported and not necessarily true width. Third-party results are as publicly reported by those companies and not independently verified by Felix Gold.

All drilling and trenching announcements

Permitted for bulk sampling

Permitted for bulk sampling, 100% owned

  1. Bulk Sample Permit approved, 23 March 2026

    Alaska DNR authorised up to 1,600 tons through December 2029

  2. No federal land in the project footprint

    No NEPA and no federal Environmental Impact Statement; permitting stays with the State

  3. 100% ownership of every Treasure Creek claim

    Secured 30 March 2026, one week after the permit

  4. Bulk sample stockpiled under the permit

    Extraction at the Bundtzen Vein continued under the bulk sample permit and mineralised material was stockpiled, for which no grade or contained metal is implied

  5. Mine permit application lodged

    The mine permit application, the Plan of Operations, was lodged with the State of Alaska on 11 November 2026, supporting small scale mining operations targeted in June 2027

June 2027 is an aspirational target, not a production target. No antimony Mineral Resource, Ore Reserve or feasibility study. Full cautionary statements

Location and infrastructure

Strategically located

Map of the Fairbanks Mining District showing the Felix Gold tenure, Treasure Creek antimony, NW Array gold, Grant Mine gold, NE Fairbanks gold, the Fort Knox mill, Fort Wainwright and Eielson Air Force Base
Why the position matters
  • District-scale tenure, 30 km from Fairbanks
  • Largest claim position in the Fairbanks Mining District
  • Year-round paved highway and grid power to the project
  • Rail, international airport and skilled workforce at Fairbanks
  • Fort Wainwright and Eielson Air Force Base nearby
  • Alaska State mining claims, no federal land in the footprint

Forward-looking statements, Mineral Resources and Competent Person information: See cautionary statements. Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest.