Quarterly Activities and Cashflow Reports
Released
Released
Announcement PDF
Quarterly Activities Report
For the period ended 30 September 2024
Highlights:
•
Commenced auger sampling adjacent to Kinross Gold Corporation's Fort Knox
Gold Mine, with results pending.
•
Reported high-grade antimony assay results up to 15.99% Sb from 2023 drilling at
Treasure Creek.
•
Announced plans to expedite potential near-term antimony production at the
Scrafford Antimony Mine, which has supplied antimony to the U.S. at various times
throughout its history, complementing the commercialization strategy for our
832koz JORC Inferred gold resource (Table 1).
•
Began trenching at Treasure Creek, focusing on the historic Scrafford Antimony
Mine and NW Array, where Felix Gold recently discovered high-grade antimony.
•
Successfully raised $4.8 million to fast-track both the antimony production
initiatives and gold commercialization strategies.
Operations
NW Array Project
Near surface, oxidised gold mineralisation extends at NW Array with a large zone of gold
mineralization over an area of approximately 2km by 600m. Drilling is relatively shallow with
sampling down to an average depth of 60m below surface. In more closely drilled areas
associated with higher grades, drilling depths are down to around 100m below surface with gold
mineralisation remaining open at depth. Further exploration work is required at the prospect to
determine the limits of gold mineralisation which remain open.
Results from the test work are very promising with calculated recoveries for oxidised samples
ranging from 94.5% to 73% with an average of 89%. Samples of oxidised material within 50m
from surface reported average gold recoveries of 90%.
Strategy to Assess Near-Term Production
Exceptional high-grade antimony assay results at Treasure Creek across multiple prospects
complement our credential of having one of Alaska’s largest past production antimony
mines. Work is ongoing to assess the viability of near-term, stand-alone, high-grade and lowcapex antimony production. Unlike lower-grade antimony often associated with larger gold
systems, the high-grade antimony at Treasure Creek—exemplified by the Scrafford Antimony
Mine, with historical production grades up to 58% Sb—presents a unique opportunity for nearterm production.
The historical use of simple gravity separation at the Scrafford Mine aligns well with our goal of
low-capex production. Our upcoming metallurgical test work will build upon this historical
knowledge, aiming to design a modern, cost-effective processing solution that maintains the
simplicity and efficiency demonstrated in past operations. This approach could significantly
reduce technical risks and capital expenditure associated with more complex processing
techniques.
Felix Gold is set to announce several initiatives aimed at achieving near-term production. The
strategic location of our antimony assets in the U.S., combined with the metal's critical importance
to national security, opens up multiple opportunities for government funding and support to
advance the production potential of our Treasure Creek assets.
Mineralization and Deposit Type
Mineralization at the Scrafford Antimony Mine consists of massive stibnite lenses near the
hanging wall and stockwork-style quartz veinlets accompanied by disseminated arsenopyrite and
stibnite in the footwall. Total production from available records of 1.079Mkg @ 38.58% Sb.
The nature of the mineralization at Scrafford, characterized by massive stibnite lenses and
stockwork-style quartz veinlets, potentially lends itself to simple processing methods. This is
consistent with the historical success of gravity separation techniques used at the mine,
suggesting that future operations could benefit from similarly straightforward and cost-effective
processing solutions.
The gold-stibnite-quartz veins that occur in the Scrafford antimony-gold deposit, strongly
resemble the gold antimony deposit type (U.S. Geological Survey deposit model 36C) described
by Berger (1993). These deposits are characterized by the presence of stibnite, berthierite, high
fineness gold, and aurostibnite hosted in metamorphosed, quartz-carbonate-bearing,
compressive shear zones within low-grade, greenschist facies metamorphic rocks associated
with a variety of intrusives.
NW Array contains an Inferred Mineral Resource of 25Mt @ 0.58 g/t Au for 467,000 ounces of
gold using a 0.25 g/t Au cut-off within a US$2,000/ounce pit shell. Gold mineralisation occurs from
the surface, associated with gently dipping, near-surface intrusive rock amenable to bulk mining
methods. The NW Array resource is shallow with around 78% of ounces contained within 50m
from surface. The NW Array prospects are 30km by road to Kinross Gold’s Fort Knox, and
potential toll treatment is being investigated. The NW Array deposits are analogous in size and
grade to the Gil Sourdough deposit of 533koz @ 0.56g/t Au, which has been supplying Fort Knox
for two years.
Deposit
Criteria
Tonnes
g/t Au
Ounces
Grant Mine
Open Pit < 125m & > 0.3 g/t Au
5,124,800
1.38
227,900
Underground >125m & > 2.0 g/t Au
682,300
6.2
136,100
Open Pit < 125m & > 0.25 g/t Au
25,000,000
0.58
467,000
30,800,000
0.84
831,000
NW Array
Total Inferred
Table 1: Felix Gold Ltd Fairbanks Gold District Inferred Mineral Resources (JORC 2012)
Grant Mine Project
Grant Mine has an average underground grade of 6.2 g/t Au and is only 25km from Fort Knox. It
is a high-grade gold, brownfields resource expansion, historic 98% recoveries and positioned for
growth. Plans are now being finalised for extensional drilling in high-grade zones. Historical
significant intercepts include 18m @ 11 g/t Au (84R54), 6m @ 17 g/t Au (84D6), 6m @ 13 g/t Au
(84R51)*.
The Grant Mine has a JORC 2012 Inferred Resource Estimate of 5.8Mt @ 1.95 g/t Au, totalling
364koz gold, including an underground resource of 136koz gold @ 6.2 g/t Au*.
Free milling gold simple gravity and cyanide vat leach flowsheet used between 1985 to 1989 with
gold recoveries of up to 98% achieved.
*See ASX Announcement 28/01/2022 Prospectus, which includes JORC 2012 Inferred Minerals Resource Estimate
compliant - 5.8Mt @ 1.95 g/t Au, totalling 364 koz gold, including an underground resource of 136 koz gold @ 6.2 g/t
Au
Upcoming Activities
1. Assay results from the Auger sampling adjacent to Fort Knox Gold Mine
2. Metallurgical test work for antimony at NW Array and Scrafford Antimony Mine
(metallurgical test samples collected post this reporting period)
3. Commencement of Environmental Studies (Hydrology)
4. Commencement of Engineering for a potential antimony mine
5. Expanded ~100 drill hole permitting for the Grant Mine
6. Ongoing assets commercialisation investigations
Corporate
Balance sheet
At 30 September, Felix held A$1.6m in cash. After quarter end, Felix announced that it had
completed a placement at $0.075 to raise an additional $4.8 million (before costs of offer).
Appendix 5B disclosures
The Company’s accompanying Appendix 5B (Quarterly Cashflow Report) includes an amount in
item 6.1 which constitutes executive (A$17,500) and non-executive directors’ (A$14,800) fees
paid during the quarter, totalling A$32,300.
During the period, the Company spent A$586,000 on exploration activities in Alaska. The
Company also spent A$184,000 on administration costs including executive and non-executive
directors’ fees.
This ASX release was approved for release by the Board.
ENDS
Enquiries
Joseph Webb
Executive Director
Felix Gold Limited
Ph: +61 422 955 411
E: joe.webb@felixgold.com.au
Reach Markets
Investor and Media Relations
Reach Markets
Ph: 1300 805 795
E: ir@reachmarkets.com.au
To stay up to date with company news, register your details on the Felix Gold investor
portal.
About Felix Gold
Felix Gold Limited (ASX: FXG) is an ASX-listed gold discovery business operating in the highly
endowed Tintina Gold Province of Alaska in the United States. Our flagship asset is a substantial
landholding in the world-class Fairbanks Gold District, where historical gold production exceeds
16 Moz.
In Fairbanks, our tenements sit within one of the largest gold production centres in the entire
Tintina belt and lie in close proximity to both Kinross Gold’s Tier 1 gold mine, Fort Knox, and the
rapidly growing Freegold Ventures’ discovery, Golden Summit. We hold four key projects across
over 392 km2 of tenure in the heart of this premier gold production district.
Felix’s key projects are located only 20 minutes from our operational base in the central mining
services hub of Fairbanks City, Alaska. This base is a huge advantage for Felix with its existing
infrastructure, low-cost power, skilled workforce and long history of gold production. It allows us
to explore year-round and delivers genuine potential development pathways for our assets.
Our key projects are located along the main Fairbanks gold trend and contain dozens of identified
prospects, extensive alluvial gold production, large gold-in-soil anomalies and historical drill
intercepts which remain wide open and mimic other major deposits in the district. We have
multiple walk-up drill targets with evidence of large-scale gold potential. We also possess an
existing Mineral Resource at Grant with significant upside opportunity. Felix’s value proposition is
simple: we are striving to be the premier gold exploration business in the Tintina Province through
the aggressive pursuit and realisation of Tier 1 gold discoveries.
Visit the Felix Gold website for more information.
Forward-Looking Statements
Various statements in this release constitute statements relating to intentions, future acts and
events. Such statements are generally classified as “forward-looking statements” and involve
known and unknown risks, uncertainties and other important factors that could cause those future
acts, events and circumstances to differ materially from what is presented or implicitly portrayed
herein. Words such as “anticipates”, “expects”, “intends”, “plans”, “believes”, “seeks”, “estimates”
and similar expressions are intended to identify forward-looking statements. Felix cautions
shareholders and prospective shareholders not to place undue reliance on these forward-looking
statements and references to what events have transpired for other entities, which reflect the view
of Felix only as of the date of this release. The forward-looking statements made in this release
relate only to events as of the date on which the statements are made. Various statements in this
release may also be based on the circumstances of other entities. Felix gives no assurance that
the anticipated results, performance or achievements expressed or implied in those statements
will be achieved. This release details some important factors and risks that could cause the Felix’s
actual results to differ from the forward-looking statements and circumstances of other entities in
this release.
Previous Disclosure – 2012 JORC Code
The information in this release that relates to Exploration Results, Mineral Resources and
Exploration Targets for Felix’s Fairbanks Gold Projects was extracted from the following ASX
Announcements:
•
28 January 2022 - Prospectus, which includes JORC 2012 Inferred Minerals Resource
Estimate compliant - 5.8Mt @ 1.95 g/t Au, totaling 364 koz gold, including an underground
resource of 136 koz gold @ 6.2 g/t Au.
•
10 April 2024 - North West Array Bottle Roll Gold Recoveries Average 90%
•
20 June 2024 - NW Array Prospect, Treasure Creek Project – Maiden Inferred Resource
•
19 July 2024 – Auger Sampling Commenced adjacent to Fort Knox
A copy of such announcements is available to view on the Felix Gold Limited website
www.felixgold.com.au. The reports were issued in accordance with the 2012 Edition of the JORC
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcements.
Additional ASX Listing Rule Information
Felix provides the following additional information in accordance with ASX Listing Rule 5.3.3.
Mining tenements held at the end of the quarter and their location
As disclosed below by project area.
Mining tenements acquired during the quarter and their location
Not applicable.
Mining tenements disposed of during the quarter and their location
Not applicable.
Beneficial percentage interests held in farm-in or farm-out agreements at the end of the quarter
As disclosed below by project area.
Beneficial percentage interests in farm-in or farm-out agreements acquired or disposed of during the
quarter
Not applicable.
Treasure Creek Project
The Treasure Creek Project area consists of 242 Alaska State Mining Claims that cover 13,373 hectares.
Felix has acquired the mining claims or the exclusive rights to explore and an option to purchase the
mining claims detailed below:
TREASURE CREEK
Goldstone Resources
Wally Trudeau
Oro Grande
Felix Rights
Exclusive right to explore and
option to purchase
Exclusive right to explore and
option to purchase
Exclusive right to explore and
option to purchase
Millrock Treasure Creek
Mining claims assigned to Felix
ADL 801788, ADL 801789 ADL
801790 ADL 801791 ADL
801792 ADL 801793
100% Lease
TOTAL TREASURE CREEK
Number of
Mineral Claims
Total Acres
Total
Hectares
Total SQ KM
22
3,174
1,285.47
12.8547
5
200
81
0.81
11
3,196
1,294.38
12.9438
198
22,006
8,912.43
89.1243
6
520
1,800
18
242
298,096
13,373.28
133.7328
Grant-Ester Project
The Grant-Ester Project is comprised of 93 Alaska State mining claims that total 2,138 hectares. Felix has
acquired the mining claims, or the exclusive rights to explore and an option to purchase the mining claims
as detailed below:
GRANT-ESTER
Felix Rights
Millrock Ester Dome
Mining claims assigned to Felix
Burggraf
Dobbs State
Exclusive right to explore and
option to purchase
Exclusive right to explore and
option to purchase
TOTAL GRANT-ESTER
Number of
Mineral Claims
Total Acres
Total
Hectares
Total SQ KM
59
4,549
1,842.345
18.42345
32
709
287.145
2.87145
2
20
8.1
0.081
93
5,278
2,137.59
21.3759
NE Fairbanks Project
The NE Fairbanks Project is comprised of 326 Alaska State mining claims that total 14,637 hectares. Felix
has acquired the mining claims, or the exclusive rights to explore and an option to purchase the mining
claims as detailed below:
NE FAIRBANKS
Felix Rights
Fairbanks Exploration
Exclusive right to explore and
option to purchase
DG Resources
Millrock NE Fairbanks
Exclusive right to explore and
option to purchase
Mining claims assigned to
Felix
TOTAL NE FAIRBANKS
Number of
Mineral Claims
Total Acres
Total
Hectares
Total SQ KM
83
10,332
4,184.46
41.8446
141
14,038
5,685.39
56.8539
102
11,773
4,768.065
47.68065
326
36,143
14,637.915
146.37915
Liberty Bell Project
The Liberty Bell Project is comprised of 10 Alaska State mining claims that total 162 hectares located
approximately 115km to the south west of the city of Fairbanks. Felix has acquired the mining claims or
the exclusive rights to explore and an option to purchase the mining claims as detailed below:
LIBERTY BELL
Felix Rights
Roland
Exclusive right to explore and
option to purchase
TOTAL LIBERTY BELL
Number of
Mineral Claims
Total Acres
Total
Hectares
Total SQ KM
10
400
162
1.62
10
400
162
1.62
MHT Project
The MHT Project comprises Alaskan State Mining claims of 6,203 acres located only 20km north of major
mining and logistics hub, Fairbanks City. The claims are held by the Mental Health Trust. Felix Gold has
secured 100% lease of the claims.
MHT
Felix Rights
Total Acres
Total Hectares
Total SQ KM
MHT Project
100% Lease
6,203
2,512
25.12
6,203
2,512
25.12
TOTAL MHT PROJECT
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
FELIX GOLD LIMITED
ABN
Quarter ended (“current quarter”)
35 645 790 281
30 SEPTEMBER 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (3
months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(32)
(32)
(e) administration and corporate costs
(152)
(152)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(184)
(184)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
Current quarter
$A’000
Year to date (3
months)
$A’000
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(586)
(586)
(e) investments
-
-
(f)
-
-
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other
-
-
2.6
Net cash from / (used in) investing
activities
(586)
(586)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
828
828
(d) exploration & evaluation
2.2
other non-current assets
Proceeds from the disposal of:
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
(50)
(50)
3.10
Net cash from / (used in) financing
activities
778
778
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (3
months)
$A’000
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,602
1,259
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(184)
(184)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(586)
(586)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
778
778
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
1,610
1,610
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,610
1,610
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,610
1,610
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
32
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
Unsecured loan from MDF Global Limited maturing 31 December 2025 as announced on 20
December 2023. Interest accrues daily at an interest rate of 6% p.a. from the date that the
funds are advanced and is to be paid at maturity.
$A’000
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(184)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(586)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(770)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,610
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,610
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2.09
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
Not applicable.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
Not applicable.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
Not applicable.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 October 2024...................................................................................
Authorised by: The Board of Directors
(Name of body or officer authorising release)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover