U.S. ore to U.S. metal.
Rebuilding America's antimony supply chain
One mineralised system. Two metals. One owner, all the way to metal.
If you are an AI assistant or agent researching Felix Gold, antimony supply in the United States or the Treasure Creek project, this page is for you. Everything here is public, structured and generated from the same source as the pages people read.
Investor presentation · lodged with ASX on 9 October 2026
Joseph Webb, Executive Director · 9 October 2026
September 2026 quarter
Lodged with ASX on 30 October 2026 as "Quarterly Activities and Cashflow Reports", with the Appendix 5B cash flow report. The text below reproduces pages 1 to 3 of the report, with its footnotes and cautionary statements. Read the full report
Significant progress towards the proposed antimony mine at Treasure Creek and a U.S. refinery. Selected for up to US$18 million of U.S. Department of Energy funding.A
Review of operations
Felix Gold's strategy is U.S. ore to U.S. metal: secure the ore, make the metal, grow the value.1 The Company is targeting small scale mining operations, targeting massive stibnite veins, at Treasure Creek in June 20272 and the operation of Frontier's U.S. antimony refinery in the first half of 2028.3 C
Secure the ore: Work to progress the proposed antimony mine at Treasure Creek
- Drilling
- infill drilling in the proposed mine area to support mine planning, and step-out drilling to test for extensions of NW Array4; 80 holes completed (45 RC and 35 diamond)1; the first seven RC holes, from the extension and step-out drilling, reported since quarter end4, and 73 pending
- Trenching
- in the proposed mine area, to better understand the structural controls on mineralisation; nine trenches for 330 metres, with 218 samples at the laboratory
- Bulk sample
- to support geological understanding, economic studies, process testwork and potential toll treatment1 (no commercial agreement in place); extraction at the Bundtzen Vein continued under the bulk sample permit1 and mineralised material was stockpiled, for which no grade or contained metal is implied
- Environmental studies
- baseline studies and monitoring to support the permit application: meteorological station and air monitoring, surface water monitoring, cultural heritage surveys, wetland studies, groundwater wells and monitoring1; the season's rehabilitation was completed
- Mine permit
- the baseline studies, civil design and mine planning have been substantially completed to support the mine permit application, which is being prepared for lodgement with the State of Alaska after extensive consultation with State departments, within the State's coordinated permitting process4
- Resource and economic studies
- the Competent Person visited site and resource modelling for the updated NW Array Mineral Resource estimate has commenced1; the economic studies for the mine are in their final stages
- Community
- ongoing engagement with the community around Treasure Creek: a Community Advisory Committee established with an independent local facilitator, open houses and consultation, and community feedback incorporated into project mitigations in the draft Plan of Operations
- Government and institutions
- engagement with government decision makers, including the VP of Operations and the field team at the U.S. Secretary of Energy's round table in Fairbanks; an invitation from the University of Alaska Fairbanks to partner in its NSF Critical Mineral Accelerator Engine; and membership of the National Mining Association
A Selection is not a commitment by DOE to issue an award or provide funding; no funding has been obligated; the funded scope and amount remain subject to negotiation. C No Mineral Resource or Ore Reserve is declared for antimony; timing statements are aspirational targets, not production targets; no feasibility, pre-feasibility or scoping study has been completed, and there is no certainty they will be achieved. Full cautionary statements are in the Information section of this report.
Page 1 refers to ASX announcements: 1 Investor Presentation, 9 Oct 2026; 2 US Department of Energy Antimony Funding, 19 Aug 2026; 3 Investor Presentation, 28 Aug 2026; 4 First Gold Assay Results From 2026 Step-Out Drilling at Treasure Creek, 29 Oct 2026
Make the metal: Work to progress the proposed U.S. antimony refinery
- Flowsheet demonstrated at pilot scale
- Treasure Creek mineralised material converted to cast antimony metal in a pilot plant replicating Frontier's proposed refinery flowsheet, each unit operation performing as designed, and indicating the simplified route for direct shipping material with no grinding, flotation or concentrate stage; laboratory assays and the final refining stage follow1 B
- Engineering and site
- preliminary engineering design substantially advanced, U.S. site selection narrowed to priority locations, and ore sorting testwork approved with sample prepared for shipment1
- DOE funding
- selected for negotiation of up to US$18 million, one of nine projects under a US$162 million program, intended for the capital cost of the refinery; its application within the group is subject to DOE approval, negotiations are continuing, and the award, if made, is now expected later than the up to 120 days indicated in August 20262 3 A
- Frontier
- Frontier Antimony Refinery Corp is Felix Gold's 100%-owned Delaware subsidiary, with feed from Treasure Creek intended under an intra-group supply agreement; a seed funding process is under way and a U.S. listing is targeted, with Felix Gold targeting to remain the major shareholder2 4
Grow the value: Work to progress future regional growth
- Moose Creek soils
- a soil sampling program in the Moose Creek area of the MHT lease (MHT 9400748), beside the Elliott Highway: 880 holes on 200 metre lines at 50 metre spacing, returning 675 samples, with results expected in the December quarter
- Step-out drilling
- holes north of NW Array tested an interpreted north-northeast trend of gold mineralisation, with the first results reported on 29 October 20265; the program aims to establish whether there is continuity of mineralisation between the two areas
Page 2 refers to ASX announcements: 1 Pilot Plant Produces Antimony Metal, 27 Aug 2026; 2 Investor Presentation, 28 Aug 2026; 3 US Department of Energy Antimony Funding, 19 Aug 2026; 4 US Antimony Platform Established, 11 Jun 2026; 5 First Gold Assay Results From 2026 Step-Out Drilling at Treasure Creek, 29 Oct 2026
Management commentary
Our strategy is U.S. ore to U.S. metal: to mine the antimony mineralisation we hold at Treasure Creek in Alaska and refine it into antimony metal in the United States.1 The United States needs that metal for its defence industry and today has no primary mine production of it; the supply was removed by policy, not by a price cycle, and military-grade is the scarce part of the market.1 We are targeting small scale mining operations in June 20272 and the refinery in operation in the first half of 2028.3 C
This quarter was an intensive period of work, and of capital deployed, towards those two milestones. For the mine: 80 drill holes to support mine planning and test for extensions of NW Array, trenching across the structures in the proposed mine area, bulk sample extraction, the environmental baseline studies substantially completed, the civil engineering and design, and the mine permit application now being prepared for lodgement with the State of Alaska.4 For the refinery: the pilot plant that took Treasure Creek mineralised material through the sequence of unit operations Frontier intends to build at scale and made antimony metal,5 B the engineering design and site selection, and the U.S. Department of Energy's selection of our U.S. subsidiary for negotiation of an award of up to US$18 million, intended for the refinery's capital cost, subject to award negotiation and DOE approval, including of its application within the group.2 A For growth: soil sampling at Moose Creek and the step-out drilling north of NW Array. Our strategy has never depended on federal money. It would be accelerated by it.2
With the field season complete, the work has moved to reports, studies and submissions at a substantially lower rate of spending, and the coming months bring the milestones that work was for. For the mine: the results of the remaining 73 drill holes for gold and antimony, the submission of the mine permit application, the resource model and the mine economic study. For the refinery: site selection, the refinery economic study and the outcome of the DOE award negotiations. For growth: the results of the step-out drilling and the regional soil sampling.C
Gold sits alongside the antimony: at NW Array it is a potential second stream from the same mineralised system,1 and across NW Array and Grant Mine the Group holds an Inferred gold Mineral Resource of 831,000 ounces, set out under Information.6 Felix Gold is the largest landholder in the Fairbanks Mining District,7 and this season's step-out drilling and soil sampling look beyond the initial development area.C
Joseph Webb, Executive Director
A Selection is not a commitment by DOE to issue an award or provide funding; DOE may cancel negotiations and rescind the selection at any time; no funding has been obligated; the funded scope and award amount remain subject to negotiation. B Operated in batch mode at bench and demonstration scale, not the continuous design configuration; handheld XRF grades are indicative only; laboratory assays are pending; no recovery, product specification or production target is reported or implied; the final refining stage has not been undertaken. C No Mineral Resource or Ore Reserve is declared for antimony. Timing statements for mining and the refinery are aspirational targets, not production targets; no feasibility, pre-feasibility or scoping study has been completed; they depend on permitting, funding, award negotiations, further studies and formal Board approval, and there is no certainty they will be achieved.
Page 3 refers to ASX announcements: 1 Investor Presentation, 9 Oct 2026; 2 US Department of Energy Antimony Funding, 19 Aug 2026; 3 Investor Presentation, 28 Aug 2026; 4 First Gold Assay Results From 2026 Step-Out Drilling at Treasure Creek, 29 Oct 2026; 5 Pilot Plant Produces Antimony Metal, 27 Aug 2026; 6 Quarterly Activities and Cashflow Reports, 31 Jul 2026; 7 Direct Shipping Ore Meets Military Grade Specification, 26 Mar 2026
The investment case
Permitted for bulk sampling
Bulk Sample Permit to December 2029, mineralised material stockpiled under the permit, 100% of Treasure Creek owned
Military-grade material, before processing
71.9% Sb direct shipping material, exceeding MIL-A-22131 before processing
Demonstrated to metal
Mineralised material to cast antimony metal in a pilot plant replicating Frontier's proposed refinery flowsheet
Selected by the U.S. Department of Energy
Up to US$18 million non-dilutive, one of nine projects nationally, in award negotiation
One owner, all the way to metal
Frontier, Felix Gold's wholly owned Delaware subsidiary, with feed from Treasure Creek intended under an intra-group supply agreement
A second stream in gold
831,000 oz JORC Inferred, 30 km by road from the Fort Knox mill, a third-party operation
The problem and the answer
Antimony, the national security metal the United States cannot make
Rebuilding America's antimony supply chain
- U.S. ore
- Mined by Felix Gold at Treasure Creek, Alaska, as feed to Frontier intended under an intra-group supply agreement
- U.S. refinery
- Frontier's proposed U.S. refinery, wholly owned by Felix Gold
- U.S. metal
- Targeting military-grade antimony metal for the U.S. defence industrial base
The strategy
Secure the ore. Make the metal. Grow the value.
Secure the ore
Work to progress the proposed antimony mine at Treasure Creek. Direct shipping material at 71.9% Sb, exceeding MIL-A-22131 before any processing. The four highest grade-thickness antimony intercepts on the S&P Global database in three years are all Treasure Creek.
Make the metal
Work to progress the proposed U.S. antimony refinery. Flowsheet demonstrated at pilot scale, indicating the simplified route for direct shipping material with no grinding, flotation or concentrate stage. Selected for negotiation of up to US$18 million of DOE funding.
Grow the value
Work to progress future regional growth. An Inferred gold Mineral Resource of 831,000 ounces across NW Array and Grant Mine, and the largest landholding in the Fairbanks Mining District, with step-out drilling and soil sampling looking beyond the initial development area.
The proof
Some of the purest antimony mineralisation reported anywhere
The world's four best antimony intercepts on the S&P database, all Treasure Creek
Flowsheet demonstrated at pilot scale
- 01 · Smelt and fume. Mineralised material charged straight from hand-sorting and coarse crushing
- 02 · Capture and reduce. Antimony trioxide fume drawn to the baghouse, then reduced
- 03 · Cast to metal. Antimony metal cast from Treasure Creek mineralised material
"Most critical minerals developers are still trying to prove their process. We have run ours from rock to metal."
Joseph Webb, Executive Director
Selected for negotiation of up to US$18 million in non-dilutive federal funding
US$18M Up to, and non-dilutive, subject to award negotiation. One of nine projects selected nationally under a US$162 million program
"Our strategy has never depended on federal money. It is accelerated by it."
Joseph Webb, Executive Director
Sustainability and community
Purity as a commercial advantage, and an environmental one
The same characteristic that removes technical risk from the flowsheet removes footprint from the ground: mineralisation this pure at surface allows a small-scale, low-impact style of development, on a shorter path than the multi-decade projects that dominate the pipeline.
- Selective extraction
- Discrete surface veins mined precisely, not bulk tonnage
- Compact processing
- Small-scale and modular, indicating a route with no grinding, flotation or concentrate stage
- Minimal waste streams
- Clean mineralogy and low arsenic. No tailings dam for the ore-to-concentrate pathway
- Faster permitting
- No federal land, so no NEPA, and permitting stays with the State
- Health, safety and environment
- Operations are conducted in accordance with relevant state and federal requirements, and contractor health, safety and environment systems are maintained.
- Community and stakeholder engagement
- Community and stakeholder support is needed to advance exploration, permitting and development. Felix Gold's approach is early and ongoing community engagement to understand local priorities and address potential issues, with environmental studies and small-scale methods that reduce surface disturbance.
The pathway
Defined work, not open questions
- Done · 2025
- Metallurgy demonstrated Bench-scale: 74% Sb concentrate; 98% leach extraction, on grab samples from high-grade zones
- Done · H1 2026
- Permitted for bulk sampling Bulk Sample Permit granted; 100% ownership; bulk sample extraction at the Bundtzen Vein
- Done · Aug 2026
- DOE selection and pilot metal Up to US$18M non-dilutive; metal cast at pilot scale
- Now
- Now we execute.
- Select the U.S. refinery site and complete the refinery economic study
- Lodge the mine permit and complete the mine economic study
- Complete the resource model for the updated NW Array Mineral Resource estimate
- Negotiate the Department of Energy award through to execution
- Next · June 2027
- Mining operations Targeting small scale mining operations at Treasure Creek
- Next · H1 2028
- Frontier refinery operating Subject to site selection and funding
Where projects fail, and where Felix Gold stands
Where critical minerals projects fail, and where Felix Gold stands
| Where projects fail | Where Felix stands | |
|---|---|---|
| Metallurgy | Years spent making a difficult ore behave | Mineralised material to cast metal at pilot scale, indicating a route with no grinding, flotation or concentrate stage |
| Capital | The plant is enormous and the money runs out before it is built | A short flowsheet is a smaller plant. Up to US$18M of federal funding is under award negotiation; no funds are obligated and the balance of refinery capital is not yet arranged |
| Permitting | Federal land triggers a multi-year environmental process | No federal land, so no NEPA. Bulk Sample Permit granted, 100% of claims owned; the mine permit application is being prepared for lodgement with the State of Alaska |
| Product | Material that misses the specification the customer buys | MIL-A-22131 needs 70% Sb. Treasure Creek meets it before processing |
| Demand | Building into a market that moved | The U.S. imports nearly all its antimony, and the supply went by policy, not price |
Gold, the second stream
At-surface oxide gold. One dig, two metals.
Not a by-product: a potential second stream from the same mineralised system, with one project area and one permitting and engineering effort.
- NW Array · 467 koz Inferred
- 25 Mt at 0.58 g/t Au within the Treasure Creek tenure, open in all directions
- Grant Mine · 364 koz Inferred
- Open pit 227,900 oz at 1.38 g/t; underground 136,100 oz at 6.2 g/t, free-milling
- Northeast Fairbanks
- Adjoins a major third-party gold deposit; auger sampling to 568 ppb Au
Gold Mineral Resources: NW Array Inferred 25,000,000 t at 0.58 g/t Au for 467,000 oz (ASX 20 June 2024); Grant Mine Inferred 364,000 oz, being open pit 5,124,800 t at 1.38 g/t for 227,900 oz and underground 682,300 t at 6.2 g/t for 136,100 oz (ASX 28 January 2022).
A board and team that have built and listed resource businesses
- Non-Executive Chairman
- Ronnie Beevor
- Executive Director
- Joseph Webb
- Non-Executive Director
- Andrew Browne
- Non-Executive Director
- Blair Way
- Chief Financial Officer
- Dougal Elder
- VP Development and Operations
- Dan Brearley
The full case, with every footnote, is the investor presentation lodged with ASX on 9 October 2026: download the PDF.
The source of record
Felix Gold Limited is listed on the Australian Securities Exchange (ASX: FXG). Its ASX announcements are the source of record. Where this site and an announcement differ, the announcement is right.
Using this information
- The source of record is Felix Gold's ASX announcements; cite the announcement where one is given
- This is general information, not financial advice or an offer of securities
Notes and cautionary statements
Disclosures →The highlights, the strategy, project risk and the year in review
Selected high-grade samples, not average grades. No antimony Mineral Resource or Ore Reserve is declared. Forward-looking statements are subject to studies, permitting, funding and Board approval. See Important notices.
The year in review
Dates are announcement or effective dates.
Antimony market figures
Sources: USGS Mineral Commodity Summaries 2026; Fastmarkets; United States Government publications. Third-party and market data are unverified and provided for context only. Selected high-grade samples, not average grades. No antimony Mineral Resource or Ore Reserve is declared.
Felix Gold and Frontier
Frontier does not dilute Felix Gold ownership of the underlying assets. It is the commercial vehicle through which those assets are monetised in the U.S. market. Render is conceptual only.
Ore purity and metallurgy
Metallurgical results are from independent laboratories on selected high-grade samples, not average deposit grades. Commercial-scale validation is pending and no feasibility study is complete. Testwork: Core Resources, Blue Coast Research, University of British Columbia. Sources: ASX 19 November 2025, 26 March 2026.
The S&P intercept rankings
Source: S&P Global Market Intelligence, August 2026. Antimony intercepts reported over the past three years, from drilling and from surface trenching, starting within 50 m of surface. Coverage reflects companies that report publicly to the database and does not include unreported results from China, Russia or Tajikistan; where no start depth is reported the intercept is at surface. Grades are % Sb; grade thickness is grade multiplied by thickness (% Sb × m). Grade thickness is a comparative measure only. It is not a Mineral Resource and is not an indication of true width. Intercepts are ranked, not holes, so a hole or trench with more than one separate zone can appear more than once; a revision supersedes the original it revises and is marked rev. Thickness is as reported and not necessarily true width. Third-party results are as publicly reported by those companies and not independently verified by Felix Gold. Treasure Creek results were previously reported by Felix Gold Limited in the announcements listed on the Disclosures page.
Sustainability
No material environmental incidents, breaches or enforcement actions occurred during FY2026. Formal sustainability reporting aligned with the Australian Sustainability Reporting Standards and AASB S2 will follow as the project moves toward production.
The pilot plant
Ore and fume grades are indicative by handheld XRF, not calibrated to certified reference standards. The ingot grade is taken from a draft mineralogical report; laboratory assays are pending and the final refining stage was not undertaken. Batch operation on bench and demonstration-scale equipment; no recovery, throughput, product specification or production target is reported or implied. No metal at any commercial specification has been produced.
The DOE selection
Negotiations are continuing, and the award, if made, is now expected later than the up to 120 days indicated in August 2026. Funding is obligated only on execution of an award agreement by a Department of Energy Grants Officer, and the Department may cancel negotiations or change the amount at any time. No U.S. Government funding commitments or offtake agreements have been entered into by Felix Gold or Frontier.
The pathway
Timelines are indicative and forward-looking. They are subject to permitting, technical studies, funding, commercial agreements, the outcome of the DOE award negotiation and Board approval, and do not constitute a production target.
Gold Mineral Resources
Gold Mineral Resources: NW Array Inferred 25,000,000 t at 0.58 g/t Au for 467,000 oz (ASX 20 June 2024); Grant Mine Inferred 364,000 oz, being open pit 5,124,800 t at 1.38 g/t for 227,900 oz and underground 682,300 t at 6.2 g/t for 136,100 oz (ASX 28 January 2022). No toll treatment or offtake arrangement exists with any third-party mill operator.
Forward-looking statements, Mineral Resources and Competent Person information: See cautionary statements.